View Single Post
  #1 (permalink)  
Old 02-09-2007, 10:31 AM
bkeric
Newsgroup Contributor
 
Posts: n/a
Scheduling Backups in Vista Business Edition

After installing a second hard drive specifically for backing up the primary
(C:\) drive, I can manually run the full system backup feature and create a
backup on the new drive. I would like to have the full system backup run
automatically on a weekly basis but can't find any way of scheduling it to do
so. I was under the impression that there was some way of doing that or am I
missing something?
Reply With Quote

 
Old 02-09-2007, 10:31 AM